05-31-2022, 08:08 PM
(05-31-2022, 07:40 PM)DanSchwartzgan Wrote: The first $20mm over costs $75mm plus another $21.25mm for the final $5mm. That is an extra $96mm in tax for being $25mm over the LT line. That is where we sit if we do nothing but bring everyone back (including Brunson).
Unless the CBA FAQ hasn't been updated (or I'm losing my mind) I see the first $20mm over costing $45mm in tax and the next $5mm costing another $18.75mm in tax ($63.75mm total rather than 96).